Summary of the whole-inventory endpoint finalization decision.
Number of items completed.
Tracks how many items have been successfully processed so far in the current operation. This value increments as each item is completed, providing real-time progress indication.
The ratio of completed to total gives the completion percentage:
progress = (completed / total) * 100
Timestamp when the event was created.
ISO 8601 formatted date-time string indicating when this event was emitted by the system. This timestamp is crucial for event ordering, performance analysis, and debugging the agent workflow execution timeline.
Format: "YYYY-MM-DDTHH:mm:ss.sssZ" (e.g., "2024-01-15T14:30:45.123Z")
Endpoint-family consolidation decisions.
A unique identifier for the event.
Function calling trial statistics (total, success, failure counts).
Requirements analysis step this finalization belongs to.
Token consumption breakdown (input, output, cache hits).
Total number of items to process.
Represents the complete count of operations, files, endpoints, or other entities that need to be processed in the current workflow step. This value is typically determined at the beginning of an operation and remains constant throughout the process.
Used together with the completed field to calculate progress percentage
and estimate time to completion.
Unique identifier for the event type.
A literal string that discriminates between different event types in the AutoBE system. This field enables TypeScript's discriminated union feature, allowing type-safe event handling through switch statements or conditional checks.
Examples: "analyzeWrite", "databaseSchema", "interfaceOperation", "testScenario"
Event fired when the Interface agent finalizes the endpoint inventory.
This pass runs after endpoint coverage review and before operation generation. It sees the whole endpoint inventory and emits sparse absorb/erase actions for endpoint surfaces that are effectively the same business API.
Author
Samchon