ISO 8601 timestamp indicating when the requirements analysis was completed.
Marks the exact moment when the Analyze agent finished the complete analysis workflow including drafting, review, amendments, and finalization. This timestamp is crucial for tracking the development timeline and determining which development artifacts need updating based on requirement changes.
ISO 8601 timestamp indicating when this history record was created.
Marks the exact moment when this history entry was initiated or when the corresponding agent activity began. This timestamp is fundamental for maintaining chronological order, tracking development progress, and understanding the temporal relationships between different phases of the vibe coding process.
Root SRS document produced by Analyze.
This is the Analyze handoff shape. It binds rendered markdown files, actor catalog, structured SRS registry, and quality manifest into one document object.
Unique identifier for this history record.
A UUID that uniquely identifies this specific history entry within the system. This identifier enables precise referencing, cross-linking between related history records, and maintaining referential integrity across the development timeline and different agent activities.
Iteration number of this requirements analysis report.
Indicates which revision of the requirements analysis this represents. A value of 0 means this is the initial requirements analysis, while higher values represent subsequent revisions based on user feedback or additional requirements gathering.
If other development artifacts (Database, Interface, Realize, Test histories) have step values lower than this value, it means those artifacts have not been updated to reflect the latest requirements and may need regeneration.
Type discriminator indicating the specific kind of history record.
Provides type-safe discrimination between different history record types such as "analyze", "database", "interface", "realize", "test", "userMessage", and "assistantMessage". This enables proper type narrowing and ensures that history records are processed according to their specific characteristics and requirements.
History record generated when the Analyze agent and user have completed all discussions regarding requirements, and a comprehensive analysis report has been issued.
The Analyze agent follows a structured workflow from initial drafting to final completion, producing multiple markdown documents that capture business requirements, technical specifications, and architectural decisions. This analysis serves as the foundation for all subsequent development phases including database design and API specification.
The requirements analysis process transforms user conversations and business needs into structured documentation that guides the entire vibe coding pipeline, ensuring that technical implementation accurately reflects business intentions.
Author
Juntak